<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Brick Lintels | Heidelberg Lintels</title>
	<atom:link href="https://heidelberglintels.com.au/tag/brick-lintels/feed/" rel="self" type="application/rss+xml" />
	<link>https://heidelberglintels.com.au</link>
	<description></description>
	<lastBuildDate>Thu, 19 Nov 2026 01:01:22 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>
	hourly	</sy:updatePeriod>
	<sy:updateFrequency>
	1	</sy:updateFrequency>
	<generator>https://wordpress.org/?v=7.1.5</generator>

<image>
	<url>https://heidelberglintels.com.au/wp-content/uploads/2024/10/HL-Favicon-150x150.png</url>
	<title>Brick Lintels | Heidelberg Lintels</title>
	<link>https://heidelberglintels.com.au</link>
	<width>32</width>
	<height>32</height>
</image> 
	<item>
		<title>Brick Lintel Orders Melbourne: Size and Finish Decisions</title>
		<link>https://heidelberglintels.com.au/brick-lintels-melbourne-size-finish/</link>
		
		<dc:creator><![CDATA[Netwizseo]]></dc:creator>
		<pubDate>Thu, 19 Nov 2026 01:01:22 +0000</pubDate>
				<category><![CDATA[Blog]]></category>
		<category><![CDATA[Brick Lintels]]></category>
		<category><![CDATA[Steel fabrication]]></category>
		<category><![CDATA[Structural steel]]></category>
		<guid isPermaLink="false">https://heidelberglintels.com.au/?p=1380</guid>

					<description><![CDATA[<p>Heidelberg Lintels supplies brick lintels in Melbourne, with sizes and finish options for Greater Melbourne projects based on confirmed drawings and loads.</p>
<p>The post <a href="https://heidelberglintels.com.au/brick-lintels-melbourne-size-finish/">Brick Lintel Orders Melbourne: Size and Finish Decisions</a> first appeared on <a href="https://heidelberglintels.com.au">Heidelberg Lintels</a>.</p>]]></description>
										<content:encoded><![CDATA[<p>Heidelberg Lintels supplies brick lintels in Melbourne, with sizes and finish options for Greater Melbourne projects based on confirmed drawings and loads.</p>
<p>Ordering structural steel from an opening width alone can result in the wrong section, length or protective treatment. Orders for brick lintels in Melbourne should follow current engineering and architectural documentation, with every opening clearly identified. Confirming these details before fabrication reduces the risk of revisions, site alterations, material replacement and delays during the brickwork stage.</p>
<h2 style="font-size: 22px;"><strong>What Must Be Confirmed Before a Brick Lintel Is Ordered?</strong></h2>
<p>A correct lintel order must match the approved design and surrounding wall conditions. We can quote from drawings or site measurements, but structural design and load confirmation remain essential, with each lintel linked to its drawing mark to avoid errors.</p>
<ul>
<li style="margin-bottom: 15px;"><strong>Lintel identification:</strong> Mark, current drawing revision, intended location and required quantity</li>
<li style="margin-bottom: 15px;"><strong>Opening dimensions:</strong> Clear span, overall length and specified bearing at each end</li>
<li style="margin-bottom: 15px;"><strong>Wall construction:</strong> Masonry thickness, supported leaf, cavity arrangement and supporting wall type</li>
<li style="margin-bottom: 15px;"><strong>Fabrication details:</strong> Section profile, dimensions, orientation, plates, cleats, holes and welds</li>
<li style="margin-bottom: 15px;"><strong>Structural information:</strong> Masonry height and all loads shown in the approved documentation</li>
<li style="margin-bottom: 15px;"><strong>Delivery scope:</strong> Required date, site access, unloading and whether supply-only or installation is required</li>
<li style="margin-bottom: 15px;"><strong>Quotation review:</strong> Our <a href="https://heidelberglintels.com.au/services/"><strong>steel supply and fabrication services</strong></a> include custom shop drawings and fabrication for Greater Melbourne projects</li>
</ul>
<h2 style="font-size: 22px;"><strong>How Do Size Decisions Affect Fabrication?</strong></h2>
<p>Size includes the clear span, overall length, section dimensions and profile, with overall length accounting for the specified bearing at both ends. The correct section for brick lintels in Melbourne also depends on masonry height, wall construction and any roof, floor or concentrated loads recorded in the structural design. Our guide to <a href="https://heidelberglintels.com.au/steel-lintel-load-capacity-before-fabrication/"><strong>steel lintel load capacity</strong></a> explains why these inputs must be considered together before fabrication.</p>
<p>We stock hot-dip galvanised 100×100×8 mm and 150×100×10 mm angles and a 200×200×10 mm T-bar. Stock availability does not confirm suitability for an opening, so the order must still match the engineer&#8217;s section, bearing and orientation requirements on the current drawing revision. A generic formula based only on opening width can produce the wrong total length, profile or load capacity.</p>
<h2 style="font-size: 22px;"><strong>Which Finish Should Be Specified?</strong></h2>
<p>The finish should follow the project specification, exposure conditions, architectural appearance and whether the steel remains visible. We list hot-dip galvanised and prime-painted bricklayers&#8217; lintels within our supply range. This decision should be resolved before fabrication because later cutting or welding can damage a completed protective coating and require appropriate repair.</p>
<p>Hot-dip galvanising provides a zinc coating for corrosion protection, while prime paint prepares steel for a nominated paint system and any required later coats. Primer alone should not be treated as complete protection for every external, coastal or masonry application. <a href="https://store.standards.org.au/reader/as-2699-3-2020" target="_blank" rel="nofollow ugc noopener"><strong>AS 2699.3:2020</strong></a> addresses durability requirements for lintels and shelf angles, so the required classification, coating system and identification requirements should be confirmed from the project documentation.</p>
<h2 style="font-size: 22px;"><strong>Heidelberg Lintels for Brick Lintels in Melbourne</strong></h2>
<p>Confirmed drawings, dimensions, quantities and finishes allow us to quote and fabricate against a clearly defined project scope. <a href="https://heidelberglintels.com.au/"><strong>Heidelberg Lintels</strong></a> provides shop drawings, steel supply, fabrication, site measuring, crane-truck delivery and installation across Greater Melbourne. Supplying complete documentation early helps us identify outstanding decisions before they affect production, delivery coordination or brickwork sequencing on site.</p>
<p><a href="https://heidelberglintels.com.au/contact/"><strong>Request a detailed quotation</strong></a> by sending us the current engineering and architectural drawings, required quantities and delivery details for your lintel order.</p><p>The post <a href="https://heidelberglintels.com.au/brick-lintels-melbourne-size-finish/">Brick Lintel Orders Melbourne: Size and Finish Decisions</a> first appeared on <a href="https://heidelberglintels.com.au">Heidelberg Lintels</a>.</p>]]></content:encoded>
					
		
		
			</item>
	</channel>
</rss>
